Toilet renovation: to start

The bathroom is an area with unique states: high humidity, humidity differences. That’s why making fixes in the bathroom, you need to definitely plan vsyakuhnya.ru the entire working process, to think about the sequence of steps to be achieved. In this article, you will learn the way to begin the repair in the restroom and what kinds of work should be performed with your own hands. Step-by-step directions for bathroom repair

Stage 1: drawing up a plan and deciding upon a layout solution.

Fix in the bathroom can be of two types:

  • Unplanned, spontaneous, arising from the can of unforeseen circumstances. By way of instance, in case of an pipe burst, flooding by neighbors.
  • Planned, which is either cosmetic or capital. It requires preparation, serious fiscal investment and time.

Begin repairs in the toilet is to determine the plan, inside. Think through the last detail, what will be the room, pick a colour. Pastel colours are traditional, as well as a combination of blue and blue, black or peach with beige.

Begin repairs in the bathroom is to ascertain the plan, interior layout. Consider detail, what will be the space, pick a colour. Pastel colours are considered traditional, as well as a blend of colours.

Next point is the option of facing substance. Generally, finishing at the toilet is performed with tile, porcelain tiles, mosaic, vinyl panels. Examine the plumbing, whether it needs to be mended. If necessary, select an appropriate alternative. Proceed to the measuring work: step all sides, figure out the area of the area. Based on these data, we indicate the location of these plumbing fixtures.

Measure 2: the selection of sanitary fixtures and substance for completing.

It’s crucial to realize that the purchase price of sanitary ware precedes the planning stage, rather than vice versa. This usually means that first we create a new design project, make a plan, then go to the store. The following thing – you should specify how big your favourite plumbing fixtures and inspect the program, whether it fits.

It is important to realize that the purchase of plumbing fittings is completed by a preparation phase, rather than vice versa. This means that first we develop a new design project, make a plan, and then go to the shop. Another one

In terms of stuff for completing, it is preferable to purchase them instantly for the entire repair cycle, in order that then you will not be diverted if something has been missing. Remember about preparing the necessary tools.

Step 3: dismantling plumbing and tiling.

After all the preliminary work has been done, proceed to the beginning of the task process:

  • Remove the sink and bathtub from the room, even if they will not be replaced with fresh ones. This manner, you may keep them intact and clean.
  • Eliminate the old tile, cleaning after it all of surfaces: ceiling, walls, floor.
  • Remove old paint from the walls, if they were previously painted, since the adhesive solution or a new layer of paint won’t adhere to surface.

Measure 4: Cost of communications: plumbing, electrical wiring.

Quite frequently in an older home, you should carefully inspect and replace not only the pipes which are in the bathroom itself, but also the principal riser, and sometimes the interfloor plumbing. Why is it worth doing this? Old pipes at any time can give a flow, then the new fix will be spoiled, it is going to call for additional investment to eliminate defects.